District Schedule of Rates (DSR) 2017-18 for the Maharashtra Public Works Department (PWD) is a standardized document providing official rates for various construction materials and labor used in government projects during that fiscal year. Key Features & Notes Applicability : These rates generally came into force around September 22, 2017 , for all districts across Maharashtra. Regional Adjustments : The schedule typically includes a 5% to 20% rate increase for specific challenging or high-cost areas, including: Municipal Corporations and Councils. Mumbai and surrounding regions. Notified tribal and mining areas. Electrical DSR

: A specific sub-division for electrical works was implemented around November 2, 2017 , covering wiring, fittings, and switchgear. Basis for Rates

: Rates were calculated based on the cost of basic materials such as cement, steel bars , and standardized labor charges provided by the PWD mechanical wing. e-DSR System : This period marked the use of the electronic-Data Sheet Rates (e-DSR)

, which organized items into chapters like roads, bridges, and buildings for easier digital access. Common Material Rates (Sample)

The following are examples of material and labor components often found in the Maharashtra PWD Material Rates for that year: Rough Shahabad (25-30mm) : Reference rate for paving/flooring. Kota Stone (Machine cut) : Polished stone rates for public building steps. Ceramic Tiles : Standard 30x30cm antiskid tiles for government flooring. Labor Components

: Often based on older benchmarks (e.g., 2007-08) but adjusted with current area-based percentages.

Official documents and PDF versions are typically hosted on the Maharashtra PWD official website or archive repositories like specific rate for a particular construction item or a specific district's regional variation? Maharashtra PWD Schedule of Rates 2017-18 | PDF - Scribd

Public Works Department (PWD) District Schedule of Rates (DSR) for Maharashtra for the year

is a critical reference document used by engineers, contractors, and government bodies to estimate construction costs for public infrastructure projects. Key Highlights of the 2017-18 DSR Effective Dates : The 2017-18 rates generally came into force on September 22, 2017 , for civil works and November 2, 2017 , for electrical works. Regional Adjustments : Standard rates often saw increases of pwd dsr 2017-18 maharashtra

for specific zones, including municipal corporations, Mumbai, notified tribal areas, and mining areas. Scope of Coverage

: The schedule covers a wide range of construction activities: Civil Works

: Excavation, structural steel, reinforced cement concrete (RCC), brick and stone masonry, waterproofing, and paving. Infrastructure

: Detailed rates for road sub-grades, sub-base and base courses, surfacing, bridge works, and cross-drainage (CD) works. Electrical

: Specific chapters for wiring, fittings, appliances, switchgear, and cables. Administrative & Technical Notes Royalty Charges

: Rates for natural minerals like sand, rubble, and metal included royalty charges (e.g., approximately ₹70.67 per cubic meter), which required documentary evidence for reimbursement. Overhead & Profit : Analysis typically included overhead charges and contractor profit , often calculated at around 7.5% to 10%. Official Sources

: You can find detailed PDFs of these schedules on platforms like Scribd - Maharashtra PWD Schedule 2017-18 or through the Maharashtra Public Works Department Typical Rates & Estimates Maharashtra PWD Schedule of Rates 2017-18 | PDF - Scribd

The District Schedule of Rates (DSR) for 2017–18 in Maharashtra, issued by the Public Works Department (PWD), became operative on September 22, 2017. It provides a standardized framework for estimating the costs of various civil and electrical works across all districts of the state. Key General Provisions District Schedule of Rates (DSR) 2017-18 for the

Regional Adjustments: Basic item rates are subject to percentage increases depending on the specific work location: Corporation Areas: 5% increase Municipal Council Areas: 4% increase

Mumbai Specific Works: 5% increase (e.g., Mantralaya, Police Mukhyalaya)

Special Zones: Increases also apply to notified tribal areas, hilly inaccessible regions, and coal/lime mining areas.

Machinery vs. Manual: Specified rates often distinguish between work performed manually and work executed by machinery. For example, manual lift charges by head load are explicitly defined and are not applicable to machine-led work.

Standard Specifications: All items must follow the PWD standard specifications; for electrical works, the "Specifications for Electrical Works 2008" (amended) apply. Basic Material Rates (Sample)

The 2017–18 DSR was calculated based on these foundational material costs: Cement: ~₹4,200 per M.T. TMT-FE-500 Reinforcement: ~₹33,425 per M.T. Structural Steel: ~₹34,834 per M.T. Corrosion Resistant Steel: ~₹35,975 per M.T.

Bitumen (Bulk VG 30): Approximately ₹31,317 per M.T. (based on period context). Labor Rates (Per Day) Standard daily rates for labor included: Civil Engineer: ₹939.00 CAD Operator / Assistant: ₹581.00 Mason / Carpenter / Fitter: ₹494.00 Mazdoor (Heavy): ₹467.00 Mazdoor (Light): ₹448.00 Categorization of Works The schedule is divided into chapters covering: GOVERNMENT OF MAHARASHTRA


Structural Breakdown of the PWD DSR 2017-18 Maharashtra

The document is organized into major sub-heads, similar to the Common Schedule of Rates (CSR). Below is a detailed breakdown of key sections with typical rates (indicative, as per zonal variations). Structural Breakdown of the PWD DSR 2017-18 Maharashtra

2. Key Features of DSR 2017-18

| Feature | Details | |--------|---------| | Authority | Chief Engineer (Administration), Public Works Department, Maharashtra State, Mumbai | | Base Year for Pricing | 2017 (market surveys conducted in Jan–June 2017) | | Coverage | All 36 districts of Maharashtra (separate rate schedules for each district) | | Structure | Volumes: Building Works, Road Works, Bridge Works, Water Supply & Sanitary Works, Electrical Works | | Update Cycle | Annual (but DSR 2017-18 was a significant revision after DSR 2015-16) | | Applicability | All state government civil contracts, Zilla Parishad works, Municipal Corporation works (by adoption) |


B. Labor Rates (Minimum wages + PWD norms)

2. Concrete Works (Section 5)

This is the most referenced section. Rates are provided for:

| Item Description | Unit | DSR 2017-18 Rate (₹) Zone Pune | | --- | --- | --- | | P.C.C. 1:4:8 using 40mm aggregate | cum | 3,850 – 4,200 | | R.C.C. M20 (1:1.5:3) with OPC 43 grade | cum | 5,950 – 6,450 | | R.C.C. M25 with superplasticizer (for bridges) | cum | 6,800 – 7,350 |

Note: These rates excluded taxes. Contractors added GST @ 18% or applicable VAT/CST (for old stocks) as per transition rules.

The Core Mandate: Roads, Bridges, and Buildings

The Maharashtra PWD is not merely a construction agency; it is the state’s landlord and logistics chief. For 2017-18, the department’s primary responsibilities were divided into three segments:

  1. State Highways (SH): Arterial roads connecting district headquarters to major towns.
  2. Major District Roads (MDR): Connecting taluka headquarters to state highways.
  3. Other District Roads (ODR) & Village Roads: The last-mile connectivity grid.
  4. Government Buildings: Secretariat, courts, police stations, schools, and hospitals.

The DSR 2017-18 systematically captured 36 districts—from the urban intensity of Mumbai Suburban to the naxal-affected terrain of Gadchiroli.

Introduction

In the domain of public infrastructure and construction management within the state of Maharashtra, standardization of financial estimates is paramount. The Public Works Department (PWD) is the nodal agency responsible for formulating and revising the Schedule of Rates (SoR), commonly known as the Data Schedule of Rates (DSR) . The PWD DSR 2017-18 Maharashtra stands as a critical benchmark document. Although it has been superseded by later revisions (2019-20, 2022-23, etc.), the 2017-18 edition remains highly relevant for arbitration cases, legacy contracts, cost audits, and time-bound disputes where the base reference period was the financial year 2017-18.

This article delves into the structure, application, key rate analyses, and procedural nuances of using the DSR 2017-18 for civil engineering works across Maharashtra.


Why the 2017-18 Edition Still Matters

Despite being several years old, the pwd dsr 2017-18 maharashtra continues to be referenced in three primary scenarios:

  1. Arbitration & Dispute Resolution: Contracts awarded in 2017 or early 2018 often lock the DSR 2017-18 as the baseline for measuring price escalation (using the PWD's price index).
  2. Completed Works Audits: The Accountant General (AG) and state audit teams refer to the DSR valid during the work execution period. Projects completed in 2018-19 are audited against this DSR.
  3. Historical Data Analysis: Researchers and policy makers use it to compare cost inflation trends in road, building, and bridge construction over a five-year period.

Common Pitfalls & Disputes Related to DSR 2017-18

Resolution: PWD Maharashtra issued several corrigenda in 2018 (e.g., Circular No. PWD-2018/CR 112) allowing provisional escalation claims based on actual material invoices, while still using DSR 2017-18 quantities.